Our Work

Commercial Development

Preload
Reconstructed trailer storage yard and maintenance facility for Wakefern Foods located in Elizabeth, NJ.
Three Caterpillar 627 scrapers performing bulk excavation for a storm water detention basin in Swedesboro, NJ.
Setting a MH base for storm sewer installation.
Drying soil with amendments to continue time sensitive work through the winter - Port project in Paulsboro, NJ.
 
Play/Pause
We are presently performing the sitework for a new 524,000sf warehouse for Wakefern Foods Corporation located in Elizabeth, NJ. Wakefern supplies the Shoprite food store network. The work involves bulk earthwork, storm sewer system, new underground firewater systems, sanitary sewers, concrete curbing, subgrade preparation, aggregate base course installation, concrete pavements and bituminous pavements along with the reconstruction of existing employee and tractor trailer parking lots.
The site development for the new 75 acre Concordville Town Center site located in Concordville, PA was recently completed by our company. Whether it is new warehouse site, a complete shopping center or the phased reconstruction of a existing facility we have the experience to get the job done.


Environmental

Preload
A Caterpillar D8N discing cement into industrial waste to stabilize the material.
Selective demolition of an abandoned gas insulated bus, at an active electrical substation in Allentown, PA.
 
Play/Pause
Many former industrial sites are finding reuse due to their location and existing industrial zoning. Over the years we have gained the knowledge and experience of what it takes to successfully work on these Brownfield sites. With personnel that are OSHA Hazwoper 40 hour trained we can provide the services to amend soils onsite or to transport the materials to a hazardous waste facility disposal. We recently performed environmental cleanup and capping work at a facility for Exelon Corp.  We have also performed excavation and capping services on multiple sites where we remove portions of the contaminated material, bury the excavated material at a designated onsite location and then cap all of the areas with fill or topsoil that is certified to be clean.

Refineries/Tank Farms/Power Plants

Preload
Complete site work package for new electrical substation.
This excavator removed rock 7 days a week on a round-the-clock basis, in a excavation that eventually extended to 49' in depth. The shoring involved H-beams and lagging with tie-backs. Dewatering occurred 24 hours a day 7 days a week.
Ongoing construction of a 49' deep pit in solid rock, shored using drilled H-beams and lagging w/tiebacks, for a river water pumping station.
 A 17 acre industrial waste landfill while under construction for the Star Refinery located in Delaware City, Delaware. The landfill was lined with 2 layers of 60Mill HDPE along with a leak detection system.
 Cleaning a unit in a refinery.
 Installing a Concrete Pad.
 Asphalt restoration work.
 
Play/Pause
We presently provide the maintenance service for the Philadelphia Energy Solutions refinery (formerly Sun Company) located in Philadelphia, PA where we employ over one hundred tradesmen during shutdowns. Other recent projects involved installing spill containment liner systems at tank farms in PA and NJ.  We've worked in the facilities of Buckeye Partners, Conoco Phillips, Plains all American Pipeline, and Sun Logistics. Projects have been successfully completed at the facilities of Calpine Energy, Exelon Energy, Florida Power and Light, Liberty Electric and PP&L Electric and many others. We are one of a limited number of contractors certified with the PA Department of Environmental Protection to perform civil tank construction for fuel storage tanks as required by the Storage Tank and Spill Prevention Act.

Hospitals

Preload
Bulk excavation for the A I DuPont Children's Hospital located in Wilmington, DE
Work on a new parking garage @ Paoli Hospital
Expansion at Riddle Memorial Hospital in Lima, PA
Rock Excavation @ AI DuPont Hospital in Wilmington
 
Play/Pause
We have performed major site work for expansions of Abington Memorial, Chestnut Hill, Doylestown, Riddle Memorial and Paoli Memorial hospitals. We are currently working at the AI DuPont Children's Hospital in Wilmington, Delaware and at the Chester County Hospital in West Chester, PA. We fully understand how to work in an environment where maintenance of existing operating facilities is of paramount importance.  Pedestrian and vehicular safety as well as minimal disruption to daily operations are par for the course.

Manufacturing

Working inside of existing manufacturing sites requires performing work in such a manner as to minimally impact the operation of the facility while maintaining the customer's schedule. Whether it requires working night shifts or around the clock 7 days a week, we can meet the customer's needs. We have worked in numerous manufacturing environments including the Air Products Company, The Boeing Company, Glaxo Smith Kline and Merck Pharmaceuticals.